In recent news, the South Central Railway (SCR) has announced that several railway services, including Visakhapatnam-connecting ones, which were diverted or had terminal changes due to the redevelopment works at
In recent news, the South Central Railway (SCR) has announced that several railway services, including Visakhapatnam-connecting ones, which were diverted or had terminal changes due to the redevelopment works at
Owing to non-interlocking works between Thadi-Duvvada DN line for Complete Track Renewal (CTR) in the Vijayawada Division of South Central Railway (SCR), some trains have been cancelled which may be
Several trains operating to and from Visakhapatnam will be temporarily cancelled on certain routes due to ongoing modern electronic interlocking works at Kotabommali Station scheduled for 11 July 2025. Below
Due to essential maintenance work scheduled between the Thadi and Duvvada railway section, several trains operating to and from Visakhapatnam will be temporarily cancelled later in August. Train Cancellations (26,
Due to traffic blocks for pre-non-interlocking and non-interlocking works related to the commissioning of the third line between Parvathipuram, Sitanagaram, Bobbili, and Donkinavalasa in the Waltair Division, several trains originating
In anticipation of Cyclone Dana, the East Coast Railway has cancelled over 70 trains in the South States. Of these 16 trains are connected to Visakhapatnam. For passengers who have
The East Coast Railway has announced that several trains will be regulated due to pre and non-interlocking works, which are being undertaken to cater to the commissioning of a 3rd
Scheduled traffic and a power block in the Waltair Division of the East Coast Railway have disrupted train services. Due to this, there are cancellations and alterations in the train
The Vijayawada Division of South Central Railway is in the process of enhancing the safety works due to which several trains have been subjected to re-route and change in their
In connection with traffic power blocks on 8 January 2024 for construction of Limited Height Subway works at Level Crossing gate in Tilaru-Urlam section (main-line) in Waltair division. Owing to






