On January 25, the Commissioner of Railway Safety carried out a thorough inspection of the newly constructed railway line connecting Ladda and Jimmidipeta. The stretch spans across 7.181 km.
The stretch is a part of the Titlagarh-Vizianagaram project, which adds a third line in the Waltair Division of the East Coast Railway. This third line is expected to improve rail capacity and facilitate smoother train operations along the corridor.
Divisional Railway Manager (Waltair) Lalit Bohra was present during the inspection along with Administrative Officer Ankush Kumar Gupta, Executive Director V.R. Naidu, and many other senior railway officials.
The railway authorities acknowledged that the completion of the third railway line was a significant milestone made possible through the cooperation and coordinated efforts of RVNL, the Civil Engineering, Electrical, Signal and Telecom departments, and Waltair’s traffic planning teams, who worked closely with the operations division.
Also read: Amrit Bharat Express to boost North-East connectivity from Vizag
Stay tuned to Yo! Vizag website and Instagram for more city and news updates.
For many families in Visakhapatnam, the Ashadam season means one thing — offers, deals, and…
The comedy-horror genre is notoriously difficult to nail, as it often risks becoming too cringey…
Union Education Minister Dharmendra Pradhan resigned from his post on Saturday, owning moral responsibility for…
State IT and HRD Minister Nara Lokesh visited the Bhogapuram International Airport on Friday night…
Giri Pradakshina, the annual event in Vizag, will commence at 6 a.m. on July 28…
Korean dramas are on a roll this year, with many impressive releases gracing our screens…