In a bid to carry out essential infrastructure work related to the Limited Height Subway between the Brahmapur and Naupada sections, a traffic cum power block has been announced for
In a bid to carry out essential infrastructure work related to the Limited Height Subway between the Brahmapur and Naupada sections, a traffic cum power block has been announced for
In connection with traffic power blocks on 8 January 2024 for construction of Limited Height Subway works at Level Crossing gate in Tilaru-Urlam section (main-line) in Waltair division. Owing to






